AI Content Chat (Beta) logo

227 Life Is On | Schneider Electric www.se.com Chapter 2 – Sustainable development Strategic Report 2. The indicators below concern all entities where Schneider Electric has operational control, and integrated in the Group for more than 2 years. Within the Group perimeter, given the complexity to obtain robust and meaningful data, in particular for small leased offices, estimated coverage indicators are provided for each reporting table. All Group industrial and logistics sites, in addition to certain major tertiary sites are covered. As per the Group’ s Environmental Policy, all industrial and logistics sites with more than 50 people and tertiary sites with more than 500 people must be ISO 14001 certified within 2 years after their acquisition or creation. A difference can, therefore, be noted with respect to the scope of financial consolidation. Comments on the indicators are included in the corresponding chapters. 2.8.1.2 Perimeter and Environmental Management Systems (ISO 14001) Indicators Units 2021 2020 2019 2018 ISO 14001 certified Sites (1) # 244 232 241 253 Industrial and logistics sites # 211 212 220 230 Tertiary sites # 33 20 21 23 % of sites certified ISO 14001 (2) % 87% 90% 89% 86% (1) ISO 14001 certification is systematic for all large industrial, logistics and tertiary sites within two years of acquisition. A reduction in the number of ISO 14001 certified sites usually results from sites closing during the year. (2) the percentage of sites certified ISO 14001 is calculated based on waste generation from certified sites vs total sites, as the majority of sites - in number - are small leased offices where certification is not relevant. 2.8.1.3 Group site consumption, emissions and waste Materials GRI Indicators Units 2021 2020 2019 2018 301-2 SSI #4 – Green material content in our products (1) % 11% 7% UP UP 301-2 SSI #5 – Primary and secondary packaging free from single-use plastic using recycled cardboard (2) % 21% 13% UP UP SSE #6 – Product revenues covered by Green Premium ™ % 78% 77% 55% 46% SSE #10 – Metric tons of avoided primary resource consumption through ‘take-back at end-of-use’ metric tons 46,293 6 0 ,14 9 53,867 43,572 SSE #15 – Reduce scrap from safety units recalled kg 4,024 4,202 UP UP 2021 audited indicators. UP = Unpublished (1) SSI #4 coverage is about 30% of purchased materials volume for our products (2) SSI #5 coverage is about 87% of total packaging purchases

Universal Registration Document Page 228 Page 230